1.Date of occurrence of the event:2026/11/07
2.Company name:Cheng Loong Corporation
3.Relationship to the Company (please enter ”head office” or
”subsidiaries”):head office
4.Reciprocal shareholding ratios:NA
5.Cause of occurrence:
(1)The fire was discovered in the outdoor material storage area at 23:04
on November 5 in site C, Tayuan Mill of the Company. Firefighters arrived
at the scene at 23:14 to assist with firefighting operations, and the fire
was brought under control at approximately 00:35 on November 6. The Company
has released material information according to the regulations.
(2)It was found that the residual fire ignited a nearby pile of paper again
due to the strong wind at the outdoor material storage area at 10:36 on
November 7 in site C, and the firefighters on-site be notified at once.
Firefighters deployed personnel to suppress the fire immediately after being
notified of the incident. The fire is brought under control now, and the
employees of Tayuan Mill and firefighters perform 24-hour monitoring to
prevent the fire from restarting. The fire does not have a significant
impact on the Company's finances and business operations. The paper mill is
operating normally.
6.Countermeasures:All raw materials damaged in this incident are insured.
After completing an actual assessment of the losses, the Company will
promptly file an insurance claim with the insurance company.
7.Any other matters that need to be specified (the information disclosure
also meets the requirements of Article 7, subparagraph 9 of the Securities
and Exchange Act Enforcement Rules, which brings forth a significant impact
on shareholders rights or the price of the securities on public companies.):
None
|